Case Study: Berkshire Road
Flood Damage

Breaking out of the existing slab due to it being saturated from an escape of water

Value of works approx £41,000

We carried out the following:

- Strip out works the ground floor
- New plumbing works routing in the ground & new boiler system
- Plastering works
- Screeding works
- New kitchen works
- New wood flooring works
- Full redecoration

Client Review